Jump to content

One side nearly done



Still need spring pins and too finish painting other springs. It took a few attempts to get the spring into position without scratching the hell out of everything.


From the album:

Electric Conversion

· 47 images
  • 47 images
  • 0 comments
  • 17 image comments

Photo Information

  • Taken with OLYMPUS IMAGING CORP. u1010,S1010
  • Focal Length 6.6 mm
  • Exposure Time 1/100
  • f Aperture f/3.5
  • ISO Speed 80

Recommended Comments

KKERGALL

Posted

what is casting # on hub IE. 9QJ ??? / FA-FB # ?? 

Keith S

Posted

The casting # of the hub with the three cracks that I welded is 8QJ8131P1. It's a poor casting - a lot of scabbing on the inside of the spokes. It also has a much bigger outer bearing (the inner is the same size as the other hub #8QJ414).

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...