053104 006.jpg
There's not always a whole lotta room when you are re-doing an existing septic, so the DM really comes through for me able to carry 20 tons of material in soft ground and tight turns. This one took 22 loads of sand and 5 loads of stone. Sometimes it's too tight for the DM and the B steps in carrying 10 tons a trip slogging through some pretty bad ground.
Recommended Comments
There are no comments to display.
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.