Jump to content

053104 006.jpg



There's not always a whole lotta room when you are re-doing an existing septic, so the DM really comes through for me able to carry 20 tons of material in soft ground and tight turns. This one took 22 loads of sand and 5 loads of stone. Sometimes it's too tight for the DM and the B steps in carrying 10 tons a trip slogging through some pretty bad ground.

From the album:

RS Martyn's working trucks

· 21 images
  • 21 images
  • 0 comments
  • 6 image comments


Recommended Comments

There are no comments to display.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...