Jump to content

ConcretePumping

Puppy Poster
  • Posts

    8
  • Joined

  • Last visited

Location

  • Location
    Ventura Ca

Profile Fields

  • Gender
    Male

ConcretePumping's Achievements

Apprentice

Apprentice (3/14)

  • First Post
  • Conversation Starter
  • Week One Done
  • One Month Later
  • One Year In

Recent Badges

0

Reputation

  1. Yes that is what i am talking about and you are right. Concrete Pumps often ideal at job sites for long periods of time waiting for concrete and than they just shut down. This is a real problem for the Concrete Pumping industry. I need some info on this problem, is there any documentation out there as to how long it has to ideal before it clogs up or how often you have to load up the truck. Is there a good fix for this? Any articles or documentation on this would be great. Thanks
  2. My customers of my web site are having problems with the 2008 and or 2009 Mack trucks with the Exhaust gas recirculation system. Problem is wide spread and I am looking for info, mass info if you know were to point me. Trucks will shut down durring a concrete pumping job. When the engine is not running the pump can not pump concrete. My web site in ConcretePumping.com and most of these guys only have one or two Macks and its been a real problem? any help would be great.
×
×
  • Create New...