15 hours ago, BillyT said:

Any members ever see the huge coal stripping shovel that was visable on I 80 either in eastern oh or western PA? Was right on the line! May have been the one that they parked a tandem dump in its bucket!  I think it was a Bucyrus Erie!

i remember that one. it sat there for a few years. 

when you are up to your armpits in alligators,

it is hard to remember you only came in to drain the swamp..

Link to comment
https://www.bigmacktrucks.com/topic/50640-big-muskie-bucket/#findComment-376436
Share on other sites

In hazelton pa. there is a marion shovel it had a 97 yard bucket now it looks like a 15 or 20 yarder on it. pegnotti owned it years ago. down the road is the anthrusite king  it pulled a 50 or 60 yard bucket. I have been all through the marion and that is something to see. When I was around them electric shovels I was told to jump from the ground onto the step never touch the ground and metal of machine stray voltage could get you the big ones run on upwards 6,000 and up volts I was told. In hazelton and surrounding towns there were hundreds of draglines that pulled 15 yards or more buckets

  • Like 1
Link to comment
https://www.bigmacktrucks.com/topic/50640-big-muskie-bucket/#findComment-376451
Share on other sites

  • 1 month later...

We have a big drag line in nd that often times can be seen from hwy 83 in Falkirk. A couple years ago I hauled a bunch of gravel into the Falkirk mine for biulding haul roads after we finnished the job they invited us to go for a tour of the mine witch included getting to go up in the drag line and watch it operate from the control room. Unfortunately they didn't let me take a try at the controls. The drag line I got to go inside had a 125 yard bucket 

 

http://swce.coop/educational-opportunity/facts-about-falkirk-mine/

  • Like 1
Link to comment
https://www.bigmacktrucks.com/topic/50640-big-muskie-bucket/#findComment-378795
Share on other sites

 

. He told me when they moved the shovel that they pulled the electrical cables with a bull dozer.

There's an 80 something year old in my area and he told a very similar story about working in the big pit mine at butte. He said they used a D4 to move the electrical cables. 

The problems we face today exist because the people who work for a living are outnumbered by the people who vote for a living.

The government can only "give" someone what they first take from another.

Link to comment
https://www.bigmacktrucks.com/topic/50640-big-muskie-bucket/#findComment-379093
Share on other sites

  • 2 weeks later...

yeah its a big one. 

 

its a coal mine, they have two big draglines they use for stripping overburden. 

 

Draglines

There are TWO Marion 8750 electric powered walking Draglines, the AChief Ironsides@ and the APrairie Rose@ remove overburden from the top of the coal seams. The draglines specifications are:

Base – The base is 80 feet in diameter and covers the area of a baseball infield.

Boom – The Dragline boom height is 215 feet from the tip of the boom to the ground and the boom is 360 feet long. The Dragline dump height-130 feet, reach depth is 180 feet.

Bucket – The bucket weighs 244,000 pounds empty and holds 125 cubic yards or 160 tons of material. The bucket is 20′ X 16′ X 10′

Cost – The cost of the Draglines in late 1970’s dollars was $38.5 million and $41.9 million.

Construction – The Draglines were built onsite over an 18 month period.

Energy – Each Dragline uses 10 megawatts ( 10,000 kilowatts ) of electricity at 25,000 volts equal to a city with a population of 1775 people.

Motors – The power to run a Dragline comes from a total of 13,000 horsepower of electric motors at 475 volts.

Production – Each Dragline completes a digging cycle every 65 seconds. The Dragline has a digital scale that records every scoop and the weight and sends this data back to the office for production tracking purposes.

Re-generate – The Draglines generate power as the bucket returns to the ground in each digging cycle.

Shoes – The Draglines walk on 16 X 80 foot shoes at 7 feet per step or 1/10th of a mile per hour.

Weight – Each Dragline weighs 13.5 million pounds.

  • Like 1
Link to comment
https://www.bigmacktrucks.com/topic/50640-big-muskie-bucket/#findComment-380430
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...